Property information
Bring the waterfront address, survey status, existing conditions, and the exact work you want evaluated.
Learn moreBrevard County waterfront project requirements
A marine project becomes easier to price, permit, and build when the waterfront address, survey, dimensions, jurisdiction, and intended structure are understood before a construction schedule is promised. This guide outlines the questions and documentation that commonly shape the path for docks, seawalls, boat lifts, and covered waterfront structures.
Bring the waterfront address, survey status, existing conditions, and the exact work you want evaluated.
Learn moreDefine the wall, dock, lift, covered structure, or combined scope so layouts and documents can be organized around the actual project.
Learn moreConfirm County, municipal, and state review requirements before representing an approval path or build schedule as certain.
Learn moreThe first permitting question is not simply whether a dock, wall, or lift needs a permit. The waterfront address, municipality or unincorporated area, waterbody, existing improvements, and work proposed determine which review path applies. A manmade canal, open lagoon shoreline, and resource-constrained waterfront do not automatically follow the same checklist.
A productive initial review identifies the property information and agency questions that need answers before materials, elevation details, or construction timing are presented as final.
For qualifying residential marine construction in manmade bodies of water, Brevard County publishes a process for docks, seawalls, and boat lifts. The County states that its published materials may not cover every situation and that additional information can be required for a particular project.
County materials identify documents that can include signed and sealed construction plans where required, a current unaltered Florida Land Surveyor survey prepared within 180 days, and a dimensional plot plan locating existing and proposed docks, seawalls, pilings, and lifts. Property-line ties, waterway width, maximum projection, turbidity-barrier location, and native vegetation affected by seawall work can also be relevant.
The City of Cocoa Beach ordinance identifies NAVD88 as the datum for the relevant seawall provision. It states that the top surface of a seawall must be at least 3.9 feet NAVD88 and no more than 5 feet NAVD88 or the property base flood elevation, whichever is greater.
That 3.9-to-5-foot reference is a Cocoa Beach rule. It is not a blanket elevation standard for Merritt Island canals, other municipalities, or every Brevard waterfront. The governing jurisdiction and property conditions must be checked for the actual address.
Dock planning can involve riparian lines, waterway width, boat approach, waterward projection, neighboring rights, water depth, and resource conditions. Florida DEP guidance describes general riparian-line setback concepts and specified exceptions, but those concepts do not create a one-size-fits-all entitlement for a particular Brevard property.
Florida Environmental Resource Permitting regulates certain activities involving surface-water flows, dredging, and filling in wetlands and surface waters. Brevard County also states that contractors and subcontractors performing marine construction work or working over water must demonstrate US Longshoreman's and Harbor Workers coverage. Riverview Marine maintains commercial general liability and USL&H coverage; project-specific certificates are available for verification subject to applicable policy terms and requirements.
No. That elevation reference is sourced to a City of Cocoa Beach ordinance. Merritt Island and other Brevard properties require review under the rules and conditions that apply to the actual location.
Brevard County's published materials for qualifying residential marine work identify a current Florida Land Surveyor survey and dimensional property information among the documents that may be needed.
Riverview Marine maintains commercial general liability and USL&H coverage. Project-specific certificates are available for verification, subject to applicable policy terms and requirements.
This page is general educational information, not legal, engineering, floodplain, or permit advice. Review the applicable jurisdiction and approved documents for the property.
Start with the waterfront address, project type, timeline, and any available survey information. Riverview Marine will review the details and discuss a practical path forward.