12-inch-center framing
Heavy-duty framing on 12-inch centers can be incorporated where it is specified for the approved dock design and decking system.
Learn moreCocoa custom dock builder
A useful Cocoa dock begins with the way the property meets the water: existing shoreline work, water access, intended boat use, elevation, layout, and the condition of any existing structure. Riverview Marine turns those variables into a clear plan for a new dock, rebuild, or dock-and-lift layout.
Deck boards are the part you see, but piling placement, beam layout, joist spacing, connections, and access details carry the work. For dock designs that call for a heavier deck system, Riverview Marine builds framing on 12-inch centers. That closer spacing is considered with the full approved structure, the decking system, and the intended use—not as a generic upgrade disconnected from the design.
Cocoa waterfronts can range from riverfront exposure to protected inland-waterway conditions. The right layout considers how a boat approaches, where people board, how the dock meets the shore, the usable platform area, and whether a lift or covered structure should be accounted for from the beginning. Composite decking options are discussed alongside pressure-treated alternatives so the finish fits the approved frame and the owner’s maintenance priorities.
Heavy-duty framing on 12-inch centers can be incorporated where it is specified for the approved dock design and decking system.
Learn morePiling location, access, platform size, and approach geometry are evaluated together instead of treating the deck as a standalone surface.
Learn moreComposite and pressure-treated decking options are reviewed for practical use, finish, maintenance expectations, and compatibility with the frame.
Learn moreThe City of Cocoa provides building permitting, plan review, and inspections under the Florida Building Code and local requirements. Its online permitting portal supports permit applications, document uploads, status checks, and inspections, but a waterfront project still needs the right site-specific documents and review path.
Depending on the property and activity, a dock can also involve state water-resource or submerged-land considerations. The environmental review route depends on the waterbody, the proposed footprint, and the nature of the work. Riverview Marine reviews the scope before representing what approvals are required or when work can start.
The right plan can be a straightforward access pier, a working platform, a dock with a lift slip, or a larger layout that ties into an existing seawall or deck. A site visit is where we separate the useful square footage from the unnecessary features and discuss how the boat, family, equipment, and shoreline all need to work together.
Riverview Marine provides a written scope built around that conversation. It addresses the structure, decking finish, access points, integration with an existing or future lift, and the review steps that apply before construction. The result is a dock plan designed for the property rather than a stock sketch forced onto it.
Where the approved structure calls for it, closer framing can support the selected decking system and a heavier-duty deck layout. Spacing is evaluated with the full design, not chosen in isolation.
Yes. Riverview Marine discusses composite and pressure-treated decking choices based on the dock design, expected use, desired finish, and maintenance priorities.
Yes. It is usually better to account for the lift, boat access, piling layout, and platform circulation during the dock-planning stage than try to retrofit those decisions later.